Registration of Steam / Feed / Blow Down Line under IBR, 1950

English

Who should apply?

The owner of Boiler intends to install Steam Pipe shall apply to the Inspector to have the boiler registered.

Documents Required:

1. Layout drawing of Steam/Feed/blow down line in triplicates, showing position of pipe fittings.
2. Details of materials dimension and specifications of pipes and pipe fittings
3. Welding details of joints.

Timeline:

64 (Sixty Four) working days from the date of submission of application, completed in all respect along with documents as per checklist.

Fees and Payments:

Class of Boiler Repairer Fee for Recognition
Class III Rs 2500/-
Class II Rs 5000/-
Class I Rs 10000/-
Special Class Rs 15000/-
Department
Department
Department of Labour Welfare