Overview:
Once the building construction is complete, one should acquire Occupancy Certificate. the application is to be made to the planning department of the GMC.
Process Flow:
- Application is to be made to the Planning Branch of GMC with all required documents.
- The field Engineer will inspect the construction of building within 21 days and will submit a report on:
- Existence of Rain Water Harvesting provision.
- Availability of Parking Space in the area provided as per drawing.
- Segregation of Waste and handover of waste to the authorized NGOs.
- Plantation of minimum 10 nos. of evergreen trees inside the plot.
- After submission of report by the Field Engineer, the Occupancy Certificate is issued to the applicant.
Eligibility Criteria:
The person applying for the occupancy certificate must have already completed the building construction with a building permit from GMC.
Fees:
There is no registration fee.
Documents Required:
- Completion Certificate submitted by RTP.
- Form 27
- Form 16
- Form 17
- Form 18
- Form 19
- Form 21
- Certificate from the Chief Electrical Inspector cum Adviser, Assam.
- NOC for License to use the Lift from the Chief Inspector of Lifts and Escalators, Assam.
- NOC from the Director of Fire and Emergency Services, Assam.
Type of Service:
It is not an online service.
Forms to be filled:
Whom to Contact:
1. Deepak Bezbarua
Associate Planner
Planning Branch, GMC
1st Floor, Uzanbazar, GMC Office
Ph: 9435031895
email:dbezit@gmail.com
2. Santanu Saikia
Associate Planner
Planning Branch, GMC
1st Floor, Uzanbazar, GMC Office
Ph: 9127057816
email: santanudas.apgmc@gmail.com