GREATER GUWAHATI DRAINAGE IMPROVEMENT WORKS

 

Construction of Sluice Gate on river Bharalu at Santipur, Guwahati, and installation of pumping facilities

 

 

BHARALU PUMPING STATION AT SANTIPUR

 

  1. 3( Three) nos. of pump houses with 2 nos of pumps having capacity 1.67 cumec in each pump house.
  2. 1(One) no of pump house with 4(Four) nos of pumps having total capacity 2.50 cumec.
  3. Total pumping capacity is 12.52 cumsec.

GUWAHATI DRAINAGE IMPROVEMENT WORKS

 

5(FIVE) SHUTTER SLUICE GATE OVER BHARALU RIVER AT SANTIPUR

Introduction : To prevent the backflow of flood water of river Brahmaputra

 

  1. 5(Five) nos of shutters having size          2.00 mx3.50 m each.
  2. Total opening size 35.00 sqm.
  3. Peak hour velocity is 2.05 m/sec.
  4. Discharge capacity is 72.00 cumec.

GUWAHATI DRAINAGE IMPROVEMENT WORKS